The challenge
Coffee Masters wanted to move to renewable energy to match its eco-friendly values, cut CO2 emissions and reduce operating costs at its main production facility.
What we installed
After a site assessment and energy audit, we designed a tailored system and installed solar panels on the roof of the production facility.
Inverters and a monitoring system were integrated so Coffee Masters can track its energy production and consumption in real time.
Planning and design covered detailed site analysis and compliance with local regulations. The installation was completed with minimal disruption to operations, followed by thorough testing and commissioning.
- System size
- 24 kW
- Installation type
- Roof-mounted solar array
- Monitoring
- Real-time monitoring system
The result
The panels produce 21,000 kWh of clean energy a year, covering a significant portion of the facility’s needs, and reduce CO2 emissions by 3,300 kg a year.
Reduced reliance on grid electricity gives Coffee Masters significant energy cost savings.
“As a company committed to sustainable practices in both product sourcing and packaging, installing solar panels was an easy decision for us. The energy savings have also allowed us to reinvest in other important projects within our company.”