The challenge
Like many businesses, Sharmic Engineering was facing rising energy costs. It wanted a reliable solar system to reduce its dependence on the grid while keeping operations efficient, and to lower its environmental impact.
What we installed
We provided a tailored solar PV system using 66 JA Solar 470 W panels, chosen for their efficiency and durability.
A 20 kW inverter converts the DC generated by the panels into usable AC for the business’s operations.
- System size
- 31 kW total
- Installation type
- Roof-mounted solar array
- Panels
- 66 × JA Solar 470 W
- Inverter
- 20 kW
The result
The system generates 27,000 kWh a year and cuts CO2 emissions by 4,000 kg a year.
Sharmic Engineering now meets a significant portion of its energy needs from solar, reducing reliance on grid electricity and lowering its energy costs.